Particulars |
Area required as per norms (Sq.M) |
Building with RCC Roof (Sq.M) |
Building with Sheet Roof (if suitable for Educational
Institution) (Sq.M) |
Total
sanctioned intake
(last 4 yrs. for Engg./
Pharmacy/
HMCT/ Arch. etc. 2 yrs. MBA and 3 yrs. for MCA) |
Built up area per student |
Total Area Available (Sq.M) |